Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 8 results ...

Chen, W T and Huang, Y-H (2006) Approximately predicting the cost and duration of school reconstruction projects in Taiwan. Construction Management and Economics, 24(12), 1231-9.

Johansen, E and Wilson, B (2006) Investigating first planning in construction. Construction Management and Economics, 24(12), 1305-14.

Lu, S-L and Sexton, M (2006) Innovation in small construction knowledge-intensive professional service firms: a case study of an architectural practice. Construction Management and Economics, 24(12), 1269-82.

Manley, K (2006) The innovation competence of repeat public sector clients in the Australian construction industry. Construction Management and Economics, 24(12), 1295-304.

  • Type: Journal Article
  • Keywords: Innovation competence; innovation indicators; client leadership
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446190600934953
  • Abstract:

    The role of client leadership in improving construction industry performance by increasing the rate and quality of innovation activity has been receiving increasing attention globally over the past decade. There has however been less attention given to the capability of clients to effectively perform this role. The literature suggests that the internal innovation competency of clients impacts on their potential to encourage innovation throughout the industry. Based on data collected via a large-scale survey of the Australian construction industry, the innovation competence of repeat public sector clients is examined using descriptive statistics. The results show that the clients have a relatively high level of innovation competence, compared to contractors, consultants and suppliers. The role of innovation competence is important. If public sector client agencies wish to protect and promote the role they play in encouraging industry innovation, they need to nurture their internal innovation competence.

Navon, R and Haskaya, I (2006) Is detailed progress monitoring possible without designated manual data collection?. Construction Management and Economics, 24(12), 1225-9.

Pan, N-F (2006) Evaluation of building performance using fuzzy FTA. Construction Management and Economics, 24(12), 1241-52.

Teo, E A-L and Harikrishna, N (2006) A quantitative model for efficient maintenance of plastered and painted façades. Construction Management and Economics, 24(12), 1283-93.

Tokdemir, O B, Arditi, D and Balcik, C (2006) ALISS: Advanced Linear Scheduling System. Construction Management and Economics, 24(12), 1253-67.